Time to obtain an electrical connection (days)

✦ DISCOVERED BY ORIONAITABLEEnterprise Surveys, World Bank (WB), uri: https://www.enterprisesurveys.org/en/dataUtilitiesGlobal
Global

About this dataset

Average wait, in days, experienced to obtain electrical connection from the day this establishment applied for it to the day it received the service.

Columns (4)

countrystringiso3stringyearstringvaluenumber

Sample rows

iso3yearvaluecountry
AFE202533.1866881944Africa Eastern and Southern
AFW202526.0559299863182Africa Western and Central
ARB202543.3913737412778Arab World
CSS202535.3446645313333Caribbean small states
CEB202594.0461155345454Central Europe and the Baltics
EAR202528.3216331847143Early-demographic dividend
EAS202517.7321562723846East Asia & Pacific
EAP202518.7847660117222East Asia & Pacific (excluding high income)

A sample of the data. The full table and an interactive map open with a free account.

Related datasets

✦ Suggested by OrionAI
Firms experiencing electrical outages (% of firms)

Percentage of firms that experienced power outages over the last complete fiscal year.

Utilities · Enterprise Surveys, World Bank (WB), uri: https://www.enterprisesurveys.org/en/data
Time required to obtain an operating license (days)

The average wait, in days, to obtain an operating license, from the day of the application to the day it was granted.

Economy · Enterprise Surveys, World Bank (WB), uri: https://www.enterprisesurveys.org/en/data
B-READY: Utility Services Pillar 3: Operational Efficiency of Utility Service Provision

B-READY focuses on ten topics that are organized following the life cycle of the firm and its participation in the market while opening, operating (or expanding), and closing (or reorganizing) a business. The Utility Services topic measures the effectiveness of regulatory frameworks, and the quality of governance and transparency of service delivery mechanisms, as well as the operational efficiency of providing electricity, water, and internet services. The third pillar measures the time required to obtain electricity, water, and internet connections, as well as the reliability of utility service supply.

Utilities · Business Ready (B-READY) project, World Bank (WB), uri: https://www.worldbank.org/en/businessready
Value lost due to electrical outages (% of sales for affected firms)

Losses due to electrical outages, as percentage of total annual sales. The value represents average losses for all firms which reported outages (please see indicator IC.ELC.OUTG.ZS).

Utilities · Enterprise Surveys, World Bank (WB), uri: https://www.enterprisesurveys.org/en/data
Access to electricity (% of population)

Access to electricity is the percentage of population with access to electricity. Electrification data are collected from industry, national surveys and international sources.

Utilities · SDG 7.1.1 Electrification Dataset, World Bank (WB), uri: https://trackingsdg7.esmap.org/downloads, note: Data is downloaded from ESMAP website. Data is released when a new Tracking SDG7 report is released., publisher: World Bank (WB), date accessed: 2024-05-16, date published: 2023
Access to electricity, rural (% of rural population)

Access to electricity, rural is the percentage of rural population with access to electricity.

Utilities · SDG 7.1.1 Electrification Dataset, World Bank (WB), uri: https://trackingsdg7.esmap.org/downloads, note: Data is downloaded from ESMAP website. Data is released when a new Tracking SDG7 report is released., publisher: World Bank (WB), date accessed: 2024-05-16, date published: 2023